In short: Site grading recorded three times at frame stage and again at completion in Oran Park.

What grading is

The fall of the finished ground away from the building, so surface water leaves rather than collects. It is designed, not incidental.

What we recorded

Site not graded, three separate records at frame stage in Oran Park, and grading still required at practical completion on a different job in the same suburb.

Why it matters on reactive ground

Water held against a footing changes the moisture in the soil beneath it. Reactive clay responds to moisture change by moving, and slab engineering is sized to resist that, not to absorb it forever.

What it does to the rest

Water at the base of a wall reaches unsealed penetrations, damp proof courses and any timber near the ground. It is the root of several other findings rather than a standalone one.

What to check before you buy

Walk the perimeter and look at where the ground sits relative to the slab edge, and where water would go in heavy rain. Then look at the same thing on the inspection report.

Written by the Owner Inspections team from inspections carried out in Gledswood Hills. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More pre-purchase guides for Gledswood Hills

All guides →

Book a building inspection in Gledswood Hills

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Gledswood Hills owners ask about this

Is grading the builder's responsibility?

At handover, yes, to the contract. Landscaping done afterwards by the owner is the owner's, which is where a lot of grading gets undone.

Can I fix it later?

Yes, and it is usually earthworks rather than building work. Knowing before you buy means pricing it.

Does it affect the termite system?

It can. Banking soil against a slab edge covers the inspection zone the termite management system relies on.