Bored piers
After boring and cage placement, before concrete
Depth and diameter against the engineering, cage centred with cover, bases clean and dry
Learn more about the bored piers inspection →Seven checkpoints across a Gledswood Hills build, each timed before the work is covered.
This is the service the suburb calls us for, and the frame stage is where our Gledswood Hills evidence sits. Nineteen photographs from a single frame inspection here record a tie down bolt missing from the bracing, a metal angle brace never tensioned, a hoop strap sitting over the plate, joist hangers left out of a first floor, a rafter cut short of its bearing and stiffeners at the steel. None of that is visible once the plasterer arrives. The earlier and later stages on this page are illustrated from Oran Park, about four kilometres north west, and every one of those captions says so.

After boring and cage placement, before concrete
Depth and diameter against the engineering, cage centred with cover, bases clean and dry
Learn more about the bored piers inspection →
The day before the pour, steel and formwork complete
Vapour barrier continuity, cover to reinforcement, beam geometry, penetrations set out, recesses formed
Learn more about the slab pre-pour inspection →
Once frame and trusses are up and the roof is on, before lining
Tie down bolts and straps, bracing tension and fixings, bearing at supports, steel connections, plumbness
Learn more about the frame inspection →
After roof, cladding and external doors, before plaster
Wall junction fixings, slotted brackets and truss boots, sarking and flashings, services clear of structure
Learn more about the lock-up (pre-plaster) inspection →
After mouldings, doors and joinery, before the painter
Balustrades and handrails, cabinetry and joinery, glazing and mirrors, render coats complete
Learn more about the fixing inspection →
After the membrane is applied and before any tile is laid
Coverage and terminations, falls to the waste, junctions and penetrations sealed, membrane undamaged
Learn more about the waterproofing inspection →
Two to three weeks before your handover date
Painting room by room, balustrades, glazing, caulking, pipe penetrations, grading and the termite notice
Learn more about the pre-handover (PCI) inspection →Frame findings are from Gledswood Hills itself; the rest are captioned with the suburb they came from.







Pre-Handover (PCI) Inspections The list written while you still have leverage, room by room.
Defect Investigation Reports One element, measured against what it was built to.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 on a suburb of near new homes.
Building and Pest Inspections Both reports from one attendance, on a suburb built since 2011. Instant online pricing, or talk to the booking team on 1300 471 805.
Frame, on the evidence we hold here. Tie down and bracing are the items that came up, they are the items that hold the roof on in a wind event, and they are invisible the moment the linings go up.
Because Gledswood Hills has booked us for frame work rather than the full sequence. Rather than present another suburb's slab or handover photographs as local, they are captioned with Oran Park, four kilometres away in the same council area.
Yes, and many owners book frame alone. The full sequence costs less per visit and the reinspection is where the value lands, but one well timed visit is far better than none.