One question, measured, when a builder says a thing is within tolerance.
An investigation measures the element against your engineering, AS 1684 for timber framing, AS 2870 for slabs and footings, AS 3700 for masonry and the Guide to Standards and Tolerances 2017.
0 checkpoints across 0 areas on a standard Gledswood Hills defect investigation report. We need the property accessible and, on a new build, the site supervisor aware that an independent inspector is attending. Anything obstructed on the day is listed as inaccessible rather than passed.
Frame items from Gledswood Hills and Oran Park, each measurable against a written requirement.










New Construction Stage Inspections Seven checks through a Gledswood Hills build, with the frame stage the one we know best here.
Pre-Handover (PCI) Inspections The list written while you still have leverage, room by room.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 on a suburb of near new homes.
Building and Pest Inspections Both reports from one attendance, on a suburb built since 2011. Instant online pricing, or talk to the booking team on 1300 471 805.
A stage inspection covers everything visible at that point. An investigation answers one question, in as much detail as the question needs, because it is usually written for a disagreement.
No. We record what was found and what it fails. Certifying a structural remedy is an engineer's function and the report says when one is needed.
NSW Fair Trading runs a dispute resolution service, and NCAT hears residential building claims. A tribunal usually wants an expert witness report drawn to its practice note, which we prepare separately.